I am planning to film all the footage I need for my music video in one day and below I have listed the timing of the day so I can allow myself enough time to get all the shots I need.
9.00 am - My house to film 3 run throughs of whole the song lip syncing on green screen back drop.
10.00 - leave home
11.00 - arrive at millennium bridge to shoot shots looking down the river and lip syncing of part of the song.
11.15 - Shoot shot walking down the bridge towards merry go round
11.30 - shoot artist on merry go round lip syncing and just going round. Once with the camera on the merry go round and once with the camera in a stationary position off the merry go round.
12. 00 - walk along to london eye and film artist lip syncing verse
12.30 - film artist singing and walking down embankment bridge.
1.00 - Get shots of artist riding bike past the london eye.
1.30 - film shoots of black cab, westminster bin, red bus, underground train and going up an under ground station escalator.
2.15 - film lip syncing in Trafalgar square
2.45 leave london
4.00 - arrive at studio in Berkhampstead and film lip syncing twice through the song and the first 24 opening shots. Also film shot of artist holding the driving licence, shots of man strangling women (silhouette behind cloth) and shots of artist dancing to the camera finishing with artist saying "shhhhh" to the camera.
5.30/6 - finish filming
No comments:
Post a Comment